CVE Port de Bordeaux

Rioux (17)

300 Nm³/h

Start of construction: mid-2024

✓ Biowaste

✓ WWTP sludge

✓ Agricultural plant waste

✓ Moving floor container

✓ Incorporator grinder

✓ Resin tanks

✓ 3 16 m³ sanitation tanks with heat recovery

✓ Vitrified steel tank concrete tank

✓ Vertical agitation fixed lateral agitation

✓ External heat exchanger

✓ Cooling tower

✓ Pumps with eccentric rotor

✓ Engineering

✓ Design

✓ Construction

✓ Commissioning